Injection Molding
Tooling and molding for your repeat plastic parts.
From prototype to production, coordinated manufacturing solutions for your custom parts.
View All Services →
Precision parts for your tight tolerances and complex geometry.
Tooling and molding for your repeat plastic parts.

Metal casting options for your part and production volume.

Cutting, forming and welding for your fabricated parts.

Custom profiles for your section, length and finish requirements.

Finishes for your appearance, corrosion and wear requirements.

Sub-assemblies and final builds for your production program.

Production tooling built around your process and volume.

Prototype parts to check fit, function and design.
DFM, process planning and production support for your project.
Inspection, documentation, inventory and delivery planning for your program.
Choose air- or liquid-cooling components around your thermal and mechanical requirements.

Manufacturing support for your cold plates, manifolds and cooling assemblies.

Find components for your power electronics, energy, laser and telecom application.

Components for your electronic systems.
Start with your functional and quality requirements.
Build around your operating environment.
From prototype to production, review material performance, manufacturability and cost for your part.
Review grade, temper and finish for your metal parts.
AluminumStrength, weight and machining›
Stainless SteelCorrosion and finish requirements›
Carbon & Alloy SteelDiscuss grade and heat treatment›
Tool SteelDiscuss tooling and wear needs›
TitaniumReview grade and part geometry›
Copper & BrassDiscuss conductivity and machining›Match your polymer to function, process and environment.
ABSReview enclosure and molding needs›
Polycarbonate (PC)Discuss clarity and impact needs›
Nylon (PA)Review moisture and wear conditions›
POM / AcetalReview fit and sliding features›
PEEKDiscuss operating conditions›
PTFEReview friction and chemical exposure›
ULTEM / PEIDiscuss thermal and electrical needs›Confirm grade availability and application requirements.
TPU / TPEReview flexibility and processing›
EPDMReview weathering and chemical exposure.›
NBRReview oil and fuel exposure.›
FKMReview temperature and chemical exposure.›
G10 / FR4Review insulation and laminate needs›
CompositesReview stiffness, weight and laminate.›Customer-Specified MaterialsConfirm your grade and requirements.›Other Specialty MaterialsDiscuss your application and grade.›Practical guidance for your part geometry and material decisions.
Prepare your process, budget and sourcing questions.
Build your knowledge before production.
Learn who we are and how we operate.
Find our U.S. support team or start a conversation.
YOUR FINISHED PRODUCT. YOUR ACCEPTANCE. YOUR DELIVERY.
Connect your BOM, approved build, product checks and protected delivery in one review. Plan assembly and packaging services around the finished condition your receiving team needs—not simply a closed carton.
2 release decisions: accept your product, then accept its pack-out. Manufacturing, validation and shipment responsibilities are confirmed in your quotation.

Installed and loose items
Methods, limits and records
Configuration and labels
Product and route review
Packing list and destination
Close the gaps between final integration, product acceptance and shipping preparation.
Control the BOM, revisions, approved alternatives and installed items.
Name the dimensions, appearance and function actually being checked.
List accessories, spares, documents and customer-approved labels.
Review weight, vulnerable features, handling and distribution route.
Confirm release authority, destination and transport responsibility.

Align installed items, loose accessories, product acceptance and logistics exclusions.
Accept the product first. Verify the packing configuration separately.

Reconcile BOM, revisions, approved alternatives and component supply responsibility.
Accept the product first. Verify the packing configuration separately.

Follow the agreed final assembly process and record required pre-closure checks.
Accept the product first. Verify the packing configuration separately.

Approve specified dimensions, appearance and function with exceptions resolved.
Accept the product first. Verify the packing configuration separately.

Match product identity, loose items, cushioning, labels and documents to the approved pack.
Accept the product first. Verify the packing configuration separately.

Confirm release records, quantities, destination and the responsible carrier or receiving team.
Accept the product first. Verify the packing configuration separately.
Review final integration, loose items, acceptance and packaging as one controlled handoff.
Final assembly services connect components and subassemblies into an agreed finished configuration. State any commissioning, software or site installation that remains outside this scope.
| Your input | Finished drawing, controlled BOM and installed-item list. |
|---|---|
| Your decision | Agree the delivered condition and outstanding operations. |

For contract assembly and packaging, assign manufactured, purchased and customer-supplied items. A complete BOM is not evidence that every item is available or approved.
| Your input | Approved sources, revisions and supplied-item condition. |
|---|---|
| Your decision | Define substitutions, shortages, incoming checks and excess stock. |

Final assembly testing needs a defined method, operating condition and limits. A mechanical fit check does not prove electrical safety, load life or full system performance.
| Your input | Acceptance plan, required resources and release authority. |
|---|---|
| Your decision | Confirm available checks and any separately arranged validation. |

Keep the accepted product identity attached to its accessories, protective materials and packing list. Packaging release cannot replace final product acceptance.
| Your input | Accepted configuration and packing specification. |
|---|---|
| Your decision | Record product acceptance and pack-out as separate decisions. |

Product assembly and packaging should address cover fit, installed hardware, feet and access. Electrical integration is included only when the wiring and test scope are confirmed.
| Your input | Housing drawing, internal assembly and access requirements. |
|---|---|
| Your decision | Agree mechanical closure and excluded integration tasks. |

Match approved internal carriers, hardware and supplied components to the BOM before they become inaccessible. Record any required pre-closure evidence.
| Your input | Component revisions, orientation and build sequence. |
|---|---|
| Your decision | Identify checks that must happen before fitting the cover. |

Final assembly inspection may cover gaps, alignment, fastening and appearance. Sealing, electrical or software tests need their own agreed method and resources.
| Your input | Approved appearance reference and test requirements. |
|---|---|
| Your decision | State coverage and record unresolved exceptions. |

Assembled product packaging should isolate exposed knobs, connector faces and finished surfaces from packing loads and loose hardware.
| Your input | Finished envelope, fragile features and accessories. |
|---|---|
| Your decision | Review contact points, cushioning and permitted orientation. |

OEM final assembly may combine manufactured parts, bought-out items and accepted modules. Specify installed adjustments and shipping restraints separately.
| Your input | Product and module drawings plus operating condition. |
|---|---|
| Your decision | Agree final setup and what the customer adjusts on receipt. |

Final assembly work instructions should connect locating, joining, tightening and protection to the approved product. Generic instructions do not define a project fastening requirement.
| Your input | Joint details, access restrictions and specified sequence. |
|---|---|
| Your decision | Approve fixtures, supports and process checks. |

Final assembly quality control needs relevant checks on the assembled product, rather than assuming accepted individual parts guarantee installed fit.
| Your input | Datums, movement requirements and specified acceptance. |
|---|---|
| Your decision | Confirm measurement conditions, sampling and records. |

Custom protective packaging needs a load path through suitable support areas. A projecting lever or thin cover should not become the packing support by accident.
| Your input | Weight, center of gravity, allowed supports and route. |
|---|---|
| Your decision | Review restraint, cushioning and handling before release. |

Industrial kitting and packaging can bring adapters, fasteners and documents together with a finished unit. Kit completeness and product assembly are separate checks.
| Your input | Installed-item list and loose-item packing list. |
|---|---|
| Your decision | Assign quantities and check responsibility for each delivery. |

Similar-looking adapters or screws may belong to different variants. Keep approved part numbers, revisions and any substitutions tied to the product order.
| Your input | Variant matrix, accessory BOM and approved alternatives. |
|---|---|
| Your decision | Define segregation and configuration checks. |

Assembly labeling and packaging should use customer-approved artwork, part identity and document revisions. Do not add compliance marks without authorization and supporting evidence.
| Your input | Approved label files, document revisions and placement. |
|---|---|
| Your decision | Agree verification and responsibility for regulated content. |

Separate hardware, cables and adapters from visible faces and moving parts. Consider how the receiving team can find and count each item.
| Your input | Accessory size, quantity and receiving sequence. |
|---|---|
| Your decision | Confirm isolated pockets, bags or dividers and packing list. |

For industrial packaging services within your assembly project, review mass, size, sensitivity, handling and transport conditions. Standalone packaging work is subject to scope review.
| Your input | Product details, destination and distribution route. |
|---|---|
| Your decision | Confirm the protection and validation needed for this shipment. |

Protective packaging services need defined contact materials and cleanliness requirements. One foam, bag or insert should not be assumed suitable for every finish or product.
| Your input | Surface, corrosion, cleanliness and material restrictions. |
|---|---|
| Your decision | Review compatible contact materials and required evidence. |

A neat package is not proof of transport performance. Define any required handling, drop, vibration or compression testing and the responsible test resource before claiming compliance.
| Your input | Distribution hazards, acceptance criteria and test request. |
|---|---|
| Your decision | Confirm the protocol and actual report requirements separately. |

Keep cushioning, restraint, carton, closure and pack quantity on a controlled packing specification. Review changes that affect the product or the shipping route.
| Your input | Approved packaging drawings, materials and closure method. |
|---|---|
| Your decision | Record the accepted configuration and change triggers. |

Final assembly traceability should connect the agreed unit or lot to its build revision, checks and shipping records. Serialization level is a project decision.
| Your input | Part number, revision, lot or serial-number rules. |
|---|---|
| Your decision | Agree marking, record retention and packing-list linkage. |

Custom assembly and packaging requires visible control of variant-specific parts and accessories. Similar cartons can conceal a configuration error.
| Your input | Order variants, BOM differences and quantity schedule. |
|---|---|
| Your decision | Agree segregation and final configuration verification. |

Check that the approved product label, accessory list and carton identification describe the same delivery. Barcode verification, if required, needs an agreed method.
| Your input | Label data, source system and checking requirements. |
|---|---|
| Your decision | Define who approves content and releases exceptions. |

Product pack out services should leave your receiving team with the agreed identity, quantities and documents. Warehouse storage and individual-order fulfillment are separate scope items.
| Your input | Packing list, destination and receiving instructions. |
|---|---|
| Your decision | Confirm delivery records and the transport handoff. |

For final assembly manufacturing, review the complete delivered product together with its accessories and proposed package. Record what remains open before repeat supply.
| Your input | Trial quantity, acceptance plan and first-pack sample. |
|---|---|
| Your decision | Approve changes and the repeat baseline. |

Turnkey assembly and packaging means the procurement, build, checks and packing work stated in your agreement. It does not automatically include product design, certification or every component process.
| Your input | Approved BOM, sourcing, technical scope and exclusions. |
|---|---|
| Your decision | Assign responsibility and separate nonrecurring work. |

For outsourced assembly and packaging, align product drawings, work instructions, acceptance and packaging revisions. A changed accessory may also change the carton or packing list.
| Your input | Accepted baseline, change authorization and affected units. |
|---|---|
| Your decision | Review changes before the next production release. |

Contract final assembly ends at an agreed delivered condition. Storage, carrier booking, freight, customs and installation need explicit responsibility and commercial terms.
| Your input | Release quantity, destination, schedule and handoff point. |
|---|---|
| Your decision | Confirm logistics inclusions and any deferred services. |

Define inspection coverage, sampling and records before ordering; do not assume every product receives every possible test.
| 01 · Configuration | Approved product BOM, drawing and installed-item revisions. |
|---|---|
| 02 · Workmanship | Specified joints, setup, closure and visible condition. |
| 03 · Agreed Function | Defined method, operating condition, limits and test coverage. |
| 04 · Completeness | Correct accessories, spares, labels and document revisions. |
| 05 · Protection | Accepted support, separation, cushioning and closure. |
| 06 · Release | Product identity, quantities, exceptions and packing-list linkage. |
Required functional, safety or transport validation is confirmed separately, with the applicable method, resources and actual evidence. Concept photographs are not inspection or shipping-test reports.

| 01 · Configuration | Approved product BOM, drawing and installed-item revisions. |
|---|---|
| 02 · Workmanship | Specified joints, setup, closure and visible condition. |
| 03 · Agreed Function | Defined method, operating condition, limits and test coverage. |
| 04 · Completeness | Correct accessories, spares, labels and document revisions. |
| 05 · Protection | Accepted support, separation, cushioning and closure. |
| 06 · Release | Product identity, quantities, exceptions and packing-list linkage. |
Required functional, safety or transport validation is confirmed separately, with the applicable method, resources and actual evidence. Concept photographs are not inspection or shipping-test reports.

| 01 · Configuration | Approved product BOM, drawing and installed-item revisions. |
|---|---|
| 02 · Workmanship | Specified joints, setup, closure and visible condition. |
| 03 · Agreed Function | Defined method, operating condition, limits and test coverage. |
| 04 · Completeness | Correct accessories, spares, labels and document revisions. |
| 05 · Protection | Accepted support, separation, cushioning and closure. |
| 06 · Release | Product identity, quantities, exceptions and packing-list linkage. |
Required functional, safety or transport validation is confirmed separately, with the applicable method, resources and actual evidence. Concept photographs are not inspection or shipping-test reports.

| 01 · Configuration | Approved product BOM, drawing and installed-item revisions. |
|---|---|
| 02 · Workmanship | Specified joints, setup, closure and visible condition. |
| 03 · Agreed Function | Defined method, operating condition, limits and test coverage. |
| 04 · Completeness | Correct accessories, spares, labels and document revisions. |
| 05 · Protection | Accepted support, separation, cushioning and closure. |
| 06 · Release | Product identity, quantities, exceptions and packing-list linkage. |
Required functional, safety or transport validation is confirmed separately, with the applicable method, resources and actual evidence. Concept photographs are not inspection or shipping-test reports.

Address the issues that can turn an accepted build into a receiving problem.
Review exposed threads, mounting faces, ports and adjustment points. Shipping protection must be removed without damaging the accepted product.
| Your input | Finished drawing and receiving interfaces. |
|---|---|
| Your decision | Agree caps, protection and removal instructions. |

Incorrect screw length, debris or inaccessible fasteners can leave an unfinished joint hidden after closure.
| Your input | Fastener specification, usable depth and required sequence. |
|---|---|
| Your decision | Define engagement, cleaning and agreed completion checks. |

Loose hardware and abrasive contact can mark a product that passed appearance inspection.
| Your input | Approved appearance zones and contact restrictions. |
|---|---|
| Your decision | Agree nonabrasive separation and final visible-condition checks. |

Review mass, center of gravity and projecting parts when planning the packing load path.
| Your input | Weight, support points, orientation and handling route. |
|---|---|
| Your decision | Confirm restraints and required package validation. |

A completed main product may still be unusable without an adapter, cable or mounting kit.
| Your input | Variant-specific accessory and document list. |
|---|---|
| Your decision | Check completeness separately from installed parts. |

Electronics protective packaging needs a defined sensitivity and handling requirement. ESD or environmental performance is not assumed from a bag color.
| Your input | Applicable sensitivity, controls and evidence requirements. |
|---|---|
| Your decision | Confirm capability, materials and any specialist validation. |

Materials, coatings and contact surfaces may require project-specific corrosion or moisture protection.
| Your input | Route, expected conditions, storage duration and restrictions. |
|---|---|
| Your decision | Agree protective methods and relevant evidence. |

A final assembly checklist should link acceptance, quantities, identity and packing configuration.
| Your input | Release authority, record scope and exception procedure. |
|---|---|
| Your decision | Agree unit or lot linkage and handoff records. |

Industrial product packaging is a controlled design input, not just a choice of carton size.

Review visible faces, covers, feet and vulnerable controls.

Identify strong support points and protected moving features.

Confirm contact compatibility and finish restrictions.

Specify separation, carton configuration and closure.

Select materials around the product and transport requirements.

Keep loose items countable and isolated from the main product.
Keep build records connected to the product and package your customer receives.

Verify revisions, component supply, accepted substitutions and quantities.

Follow approved integration, setup and work instructions.

Record agreed product checks and authorized exceptions.

Verify accessories, labels, protection, documents and shipping handoff.
Ask each final assembly manufacturer to quote the same approved configuration and packing boundary.
Manufactured, purchased and supplied items with sourcing responsibility.
Fixtures, instructions, check development and package development.
Assembly, agreed checks, packaging materials, pack-out and records.
ILLUSTRATIVE PACKING-LIST EXAMPLE — NOT A PRICE OR MINIMUM ORDER
Nominal packing-list demand only. Trial units, spares and permitted process losses are agreed separately. Carton quantity depends on the approved product and packaging specification.

Finished mechanical products with agreed setup and accessory kits.

Closed configurations, protected visible faces and approved loose items.

Adjustable products with defined receiving condition and protection.

Final assembly, configuration and protected moving interfaces.
Illustrative product and packaging concepts, not customer case studies or transport-validation evidence. Your product, manufacturing route and test scope are confirmed for your project.
Connect your finished-product review, approval decisions and delivery requirements to the responsible project team.

Resolve configuration, approval and handoff questions.
Confirm purchased, manufactured and supplied items.
Agree product checks and packaging validation responsibility.
Record identity, quantities, protection and destination.
Request an NDA before sending confidential files. Flag missing acceptance or packaging inputs for review rather than treating them as approved assumptions.
Aligned BOM, drawings, configuration and installed items.
Agreed appearance, dimensions, function and exceptions.
Accessories, identity, documents, protection and handoff.
Approve the first finished configuration and its packing specification before releasing repeat deliveries.
Final product assembly joins components and subassemblies into the agreed finished product. Acceptance confirms the specified product condition; packaging prepares that accepted product for its receiving and transport requirements. A closed carton alone does not establish product acceptance.
Provide the finished drawing, controlled BOM, revisions, supply responsibility and quantities. Add product acceptance, test coverage, accessories, approved labels and documents, plus size, weight, packaging, destination and required date. Identify open design or validation work.
The quote depends on parts, sourcing, fixtures, setup, final integration, checks, records, packing materials and pack-out labor. Compare final assembly companies on the same scope. Ask for nonrecurring development, repeat unit work, packaging and freight to be distinguished.
Customer-supplied items can enter the project review. Agree incoming checks, quantity, shortages, damaged items, approved substitutions, permitted loss and unused stock. Assign packaging-material supply and acceptance responsibility as well.
Your approved acceptance plan defines dimensions, visible condition, function, sampling and records. Separate product checks from accessory, label and packaging checks. Required safety, life, sealing or transport testing needs confirmed methods and resources; it is not automatically included.
Final assembly minimum order and final assembly lead time depend on sourcing, component availability, fixtures, trial approval, test development, packaging development and scheduling. Send trial and repeat demand with your required date for a project-specific review.
Start with product size, weight, center of gravity, fragile features, finish and transport route. Define suitable support, restraint, cushioning, separated accessories and closure. Agree any required validation and actual reports before making transport-performance claims.
Final assembly and packaging prepares the agreed finished product and its pack-out. Fulfillment can add storage, order picking, individual shipment processing and returns. These logistics services, freight and customs are separate scope items unless included in your quotation.
No. An approved packing layout identifies the agreed configuration; it does not by itself demonstrate drop, vibration or compression performance. If validation is required, agree the product-package combination, distribution environment, protocol, acceptance and test resource.
Define the installed configuration and separate loose-item list in the scope review. Your final assembly and packaging plan should check both product acceptance and kit completeness, with identities, quantities and approved document revisions linked to the delivery.