Injection Molding
Tooling and molding for your repeat plastic parts.
From prototype to production, coordinated manufacturing solutions for your custom parts.
View All Services →
Precision parts for your tight tolerances and complex geometry.
Tooling and molding for your repeat plastic parts.

Metal casting options for your part and production volume.

Cutting, forming and welding for your fabricated parts.

Custom profiles for your section, length and finish requirements.

Finishes for your appearance, corrosion and wear requirements.

Sub-assemblies and final builds for your production program.

Production tooling built around your process and volume.

Prototype parts to check fit, function and design.
DFM, process planning and production support for your project.
Inspection, documentation, inventory and delivery planning for your program.
Choose air- or liquid-cooling components around your thermal and mechanical requirements.

Manufacturing support for your cold plates, manifolds and cooling assemblies.

Find components for your power electronics, energy, laser and telecom application.

Components for your electronic systems.
Start with your functional and quality requirements.
Build around your operating environment.
From prototype to production, review material performance, manufacturability and cost for your part.
Review grade, temper and finish for your metal parts.
AluminumStrength, weight and machining›
Stainless SteelCorrosion and finish requirements›
Carbon & Alloy SteelDiscuss grade and heat treatment›
Tool SteelDiscuss tooling and wear needs›
TitaniumReview grade and part geometry›
Copper & Brass & BronzeDiscuss conductivity and machining›Match your polymer to function, process and environment.
ABSReview enclosure and molding needs›
Polycarbonate (PC)Discuss clarity and impact needs›
Nylon (PA)Review moisture and wear conditions›
POM / AcetalReview fit and sliding features›
PEEKDiscuss operating conditions›
PTFEReview friction and chemical exposure›
ULTEM / PEIDiscuss thermal and electrical needs›Confirm grade availability and application requirements.
TPU / TPEReview flexibility and processing›
EPDMReview weathering and chemical exposure.›
NBRReview oil and fuel exposure.›
FKMReview temperature and chemical exposure.›
G10 / FR4Review insulation and laminate needs›
CompositesReview stiffness, weight and laminate.›Customer-Specified MaterialsConfirm your grade and requirements.›Other Specialty MaterialsDiscuss your application and grade.›Practical guidance for your part geometry and material decisions.
Prepare your process, budget and sourcing questions.
Build your knowledge before production.
Learn who we are and how we operate.
Find our U.S. support team or start a conversation.
YOUR INTERFACES · YOUR CONDITIONS · YOUR ACCEPTANCE
Review your IGBT cooling component against the exact module part number, loss map, mounting instructions and installed conditions. Define the contact face, mounting holes, thermal interface and air or coolant connections before manufacturing release.

Illustrative component concept
Critical geometry & interfaces
Grades, condition & compatibility
Defined route & final state
Agreed methods & records
Define the module footprint, dissipated losses, contact stack, installed conditions and sample evidence.

Your IGBT module cooling interface starts with the selected part number, released mounting instructions, contact footprint, TIM and any required electrical isolation. Identify the temperature limits and who approves the module assembly.

Share the module loss map and relevant operating or transient conditions. State available airflow or coolant inlet temperature and flow. Keep IGBT cooling thermal resistance tied to named temperature nodes and the actual test configuration.

Define IGBT cold plate mounting holes, datums, module keep-outs, fasteners and service access from the selected module documentation. For liquid cooling, add port standards, fitting positions, seals and the supplied assembly boundary.

When choosing an IGBT cold plate manufacturer, compare the supplied scope and required evidence against your drawing. Your custom IGBT cold plate quote should include material, final condition, quantities and agreed dimensional, leak and separate performance checks.
Illustrative engineering concepts
Choose a route against the actual module and installed conditions. These concepts do not establish package compatibility, an operating power range or complete converter qualification.

Review available airflow, fin direction, base contact and enclosure clearance.
Review this cooling scope →
Define heat-source map, coolant, ports, contact lands and sample checks.
Review this cooling scope →
Review copper or aluminum geometry, mounting datums and final surface state.
Review this cooling scope →
List mounting hardware, selected fittings, brackets and delivered records.
Review this cooling scope →Illustrative engineering concepts
IGBT cooling plate machining should follow the controlled module footprint, mating datums and final inspection state. For IGBT liquid cooling, define the coolant, flow, inlet temperature, channels, ports and allowed pressure loss. An IGBT heat sink prototype needs the available airflow, fin direction, enclosure and actual dissipated losses; neither a module current rating nor a photograph establishes the cooling requirement.
Mounting references: Infineon Easy module instructions → · Fuji IGBT module application manual →. Use the current documentation for your exact module; these references do not establish LK MFG capability, compatibility or a universal mounting limit.
Compare bulk conduction and mass alongside your module contact stack, coolant, coatings and manufacturing route. These references are not finished IGBT cooling tests or material substitution approvals.
Hydro 6061-T6 at 25°C. KME Cu-ETP annealed at 20°C.
Calculate finished mass from the actual geometry. A material conductivity difference does not establish a device-temperature reduction.
| Grade | European reference | Si | Fe | Cu | Mn | Mg | Zn | Al |
|---|---|---|---|---|---|---|---|---|
| 6061 | EN AW-6061 · AlMg1SiCu | 0.40–0.80 | ≤0.70 | 0.15–0.40 | ≤0.15 | 0.80–1.20 | ≤0.25 | Balance |
| C11000 | Cu-ETP · CW004A | — | — | ≥99.90 | — | — | — | — |
Selected elements only. Dash means not specified in this summary, not zero. 6061: Cr 0.04–0.35%, Ti ≤0.15%; C11000: O ≤0.040%; do not relabel Cu-ETP as oxygen-free copper. Aluminum other elements ≤0.05% each / ≤0.15% total. The purchasing standard and certificate govern. Confirm product form, temper, joining compatibility and required final condition.
Sources: Hydro 6061 → · KME Cu-ETP →
Set a named temperature budget, follow the selected mounting documentation and define validation. The numeric graphic is chosen arithmetic, not a measured thermal curve, junction limit or part rating.
Chosen example: a 20 K case-to-reference allowance divided by 200, 400 or 800 W dissipated losses gives 0.10, 0.05 or 0.025 K/W. These are not LK MFG ratings or recommended module limits. Define the actual reference node, contact path and transient conditions; junction-to-case behavior remains a separate module-specific input.
Surface and installation requirements depend on the selected package. Use its released instructions and controlled drawing; do not transfer numeric flatness, TIM or tightening values from a different module.
State the actual configuration, operating conditions and acceptance before validation. Dimensions, leak integrity, electrical isolation and thermal performance are separate evidence scopes.
Separate your thermal contact faces, sealing interfaces and wetted passages. Confirm the specified final condition with the mating assembly.

Define the module contact area and final surface inspection state from the released drawing.

Specify the finished thread, fitting engagement and agreed sealing surfaces.

Protect fins, finished contact faces and ports; agree cleaning and shipment condition.
A finish is not a universal cooling improvement. Confirm its purpose, compatibility and inspection state. Review surface finishing options →
Illustrative engineering concepts
Put the dimensions that control sealing, assembly fit and heat transfer on your drawing.

Illustrative IGBT cold plate section concept
Module loss map, selected TIM and approved clamping stack
Thread designation, seal land and fitting engagement
Hole pattern, datum scheme and tool access
Joining access, wall thickness and cleaning scope
Flatness, masking, protected interfaces and inspection state
Resolve contact flatness, TIM and isolation responsibility, connection checks, material, operating conditions and approval evidence.
Specify IGBT cooling plate flatness, roughness and inspection area from the exact module mounting instructions and released drawing. Include the installed clamping arrangement and final manufacturing state. Do not copy one package's numeric limits onto another.
Controlled drawing and the relevant service conditions.
Agreed method, inspection state, limits and required records.

Illustrative engineering concept
Review IGBT cooling electrical isolation separately from thermal contact. Use the selected module and interface material documentation for dielectric requirements, installation and qualification; a thermally conductive paste or coating must not be assumed to provide the required insulation.
Controlled drawing and the relevant service conditions.
Agreed method, inspection state, limits and required records.

Exploded interface concept; TIM properties and electrical isolation are not established by the illustration.
Agree IGBT cooling plate leak testing for the actual supplied plate, joining route, fittings, seals and plugs. State the medium, temperature, limit, duration and records. Pressure checks and thermal or hydraulic validation require their own defined scopes.
Controlled drawing and the relevant service conditions.
Agreed method, inspection state, limits and required records.

Illustrative engineering concept
Review IGBT cooling component material selection against contact geometry, mass, manufacturing route and all wetted materials, coatings, seals and coolant conditions. Bulk conductivity is one reference, not finished cooling performance or compatibility approval.
Controlled drawing and the relevant service conditions.
Agreed method, inspection state, limits and required records.

Illustrative engineering concept
For an air-cooled part, state installed airflow and fin direction. For a cold plate, evaluate IGBT cooling plate pressure drop at the specified fluid, temperature, flow and measurement boundary. Keep pump duty, flow sharing and module thermal validation with their assigned owners.
Controlled drawing and the relevant service conditions.
Agreed method, inspection state, limits and required records.

Illustrative engineering concept
Define IGBT cooling sample approval for the controlled revision, material, finished contact face, mounting fit and specified records. Approve hydraulic and thermal performance using the agreed module losses, TIM, mounting, sensors and operating conditions.
Controlled drawing and the relevant service conditions.
Agreed method, inspection state, limits and required records.

Illustrative engineering concept
Confirm revision, interfaces and operating inputs.
Agree materials, joining and final machining.
Review the finished component and assembly fit.
Assess specified dimensions, joints and test records.
Release the accepted revision, packaging and repeat-order scope.

Illustrative component concept
Your custom IGBT cold plate quote should connect the exact module footprint and mounting documentation to the material, final contact surface, ports and supplied records. Agree sample dimensions, fit, cleanliness and specified leak checks. A dimensional report or leak record does not establish junction temperature, electrical isolation or complete converter performance.
These are component review contexts, not customer cases, automotive qualification, certified converters or endorsed package compatibility.

Review the selected module loss map and installed cooling route.
Control contact footprint, mounting and nearby keep-outs.
Define operating conditions and the approval owner.
Review coolant connections or available airflow.
Match the released module interfaces and supplied part scope.
State exact footprints and the dissipated losses.
Control TIM, mounting, sensor positions and operating inputs.
Match the exact module and installed revisions.
Ask your quote to separate component manufacturing, joining, finishing, inspection and any independently agreed validation. The drawing review confirms availability, quantities and delivery scope.
Provide the exact module part number, datasheet and current mounting instructions, loss map and operating conditions, footprint and datums, TIM and isolation requirements, coolant or airflow, quantities and required records. Mark the supplied manufacturing boundary.
No. Use the selected module's current mounting documentation and released drawing. The inspection area, surface conditions, clamp arrangement and final part state must match that package and assembly; a generic catalog value is not a universal requirement.
Do not assume it. Confirm whether the selected package and specified interface system provide the required dielectric function, and follow their installation and qualification requirements. Thermal contact, electrical isolation and any required electrical verification are separate approval decisions.
Agree material identity, contact face and mounting dimensions, fit, cleanliness and any specified leak or pressure checks. Define thermal and hydraulic validation separately with module losses, TIM, mounting, inlet or ambient conditions, flow and measurement locations.
Compare the actual dissipated losses, temperature budget, mounting envelope and installed air or coolant conditions. Review component availability and manufacturing route against your drawing; there is no universal power threshold that selects a route for every module.
No. A leak check covers the defined fluid-integrity boundary. Module temperature also depends on losses, thermal contact, mounting and operating conditions. Name the validation owner and agree the thermal test and acceptance before release.