Injection Molding
Tooling and molding for your repeat plastic parts.
From prototype to production, coordinated manufacturing solutions for your custom parts.
View All Services →
Precision parts for your tight tolerances and complex geometry.
Tooling and molding for your repeat plastic parts.

Metal casting options for your part and production volume.

Cutting, forming and welding for your fabricated parts.

Custom profiles for your section, length and finish requirements.

Finishes for your appearance, corrosion and wear requirements.

Sub-assemblies and final builds for your production program.

Production tooling built around your process and volume.

Prototype parts to check fit, function and design.
DFM, process planning and production support for your project.
Inspection, documentation, inventory and delivery planning for your program.
Choose air- or liquid-cooling components around your thermal and mechanical requirements.

Manufacturing support for your cold plates, manifolds and cooling assemblies.

Find components for your power electronics, energy, laser and telecom application.

Components for your electronic systems.
Start with your functional and quality requirements.
Build around your operating environment.
From prototype to production, review material performance, manufacturability and cost for your part.
Review grade, temper and finish for your metal parts.
AluminumStrength, weight and machining›
Stainless SteelCorrosion and finish requirements›
Carbon & Alloy SteelDiscuss grade and heat treatment›
Tool SteelDiscuss tooling and wear needs›
TitaniumReview grade and part geometry›
Copper & Brass & BronzeDiscuss conductivity and machining›Match your polymer to function, process and environment.
ABSReview enclosure and molding needs›
Polycarbonate (PC)Discuss clarity and impact needs›
Nylon (PA)Review moisture and wear conditions›
POM / AcetalReview fit and sliding features›
PEEKDiscuss operating conditions›
PTFEReview friction and chemical exposure›
ULTEM / PEIDiscuss thermal and electrical needs›Confirm grade availability and application requirements.
TPU / TPEReview flexibility and processing›
EPDMReview weathering and chemical exposure.›
NBRReview oil and fuel exposure.›
FKMReview temperature and chemical exposure.›
G10 / FR4Review insulation and laminate needs›
CompositesReview stiffness, weight and laminate.›Customer-Specified MaterialsConfirm your grade and requirements.›Other Specialty MaterialsDiscuss your application and grade.›Practical guidance for your part geometry and material decisions.
Prepare your process, budget and sourcing questions.
Build your knowledge before production.
Learn who we are and how we operate.
Find our U.S. support team or start a conversation.
YOUR INTERFACES · YOUR CONDITIONS · YOUR ACCEPTANCE
For your cooling loops and assemblies, list the cold plates, manifolds, machined interfaces, selected hoses and fittings included in the order. Review routing, service access, wetted materials, cleanliness and the delivered assembly checks before release.

Illustrative component concept
Critical geometry & interfaces
Grades, condition & compatibility
Defined route & final state
Agreed methods & records
Define supplied components, selected hoses and fittings, routing, service access and acceptance.

Your liquid cooling loop assembly quote should name supplied part numbers, revisions, quantities, purchased hoses and fittings, seals, brackets and the final assembled state. Identify anything provided by your system integrator.

Define cooling loop hose routing requirements using the selected hose specification, approved bend radius, installed length, restraint, tool access and removal sequence. Review nearby edges, keep-outs and connector operation in the actual assembly.

Review cooling loop material compatibility against the actual coolant formulation, concentration, operating temperatures, connected metals, coatings, seals and selected hose materials. Include cleaning and preservation chemicals where relevant.

Your cooling loop assembly drawing requirements should include the released routing layout, connection schedule, BOM, hose and fitting specifications, final condition and acceptance records. A liquid cooling loop prototype assembly should resolve installation and service interfaces before repeat supply.
Illustrative engineering concepts
Build the quotation around the actual supplied parts and assembly state. Pumps, controls and complete-system validation need a separately defined agreement.

Define adapter ports, seal lands, datums and final condition.
Review this supplied scope →
Specify approved hoses, end fittings, lengths, bends and restraints.
Review this supplied scope →
List manifold ports, selected fittings, seals and supplied tests.
Review this supplied scope →
Agree cold plates, manifold, hoses, brackets and the supplied boundary.
Review this supplied scope →Illustrative engineering concepts
A custom liquid cooling loop assembly needs a controlled bill of materials and the actual installed geometry. Cooling loop component manufacturing and cooling loop interface machining cover the released parts and final mating features. Your cooling loop manifold assembly should identify selected fittings, seals, hoses, brackets and supplied records; pumps, controls and complete-system validation require a separate defined scope.
Choose material with your coolant, connected metals, seals, mass and manufacturing route in view. These stock references do not establish corrosion compatibility, a pressure rating or manifold flow performance.
Bulk conductivity does not establish the hydraulic or thermal performance of your assembled loop.
Estimate mass using your finished volume. Confirm exact grade, product specification and required condition with the purchasing documents.
| Grade / European reference | Si | Fe | Cu | Mn | Mg | Zn | Al |
|---|---|---|---|---|---|---|---|
| 6061 · EN AW-6061 · AlMg1SiCu | 0.40–0.80 | ≤0.70 | 0.15–0.40 | ≤0.15 | 0.80–1.20 | ≤0.25 | Balance |
6061 additional selected limits: Cr 0.04–0.35%, Ti ≤0.15%; other elements ≤0.05% each / ≤0.15% total. Hydro reference, not a finished loop-component certificate.
| Reference grade | European identifier | UNS | C | Cr | Ni | Mo |
|---|---|---|---|---|---|---|
| 304 | EN 1.4301 | S30400 | 0.04 | 18.1 | 8.1 | — |
| 316L | EN 1.4404 | S31603 | 0.02 | 17.2 | 10.1 | 2.1 |
Outokumpu Core/Supra Table 1 typical composition and Table 7 physical references. Dash means not listed in the selected summary, not zero. European identifiers aid drawing review; substitutions and final purchasing limits require approval.
Sources: Hydro 6061 → · Outokumpu Core 304 → · Outokumpu Supra 316L →
Review series-loss bookkeeping, the tested configuration and performance ownership. The numeric example is chosen arithmetic, not a test report, pump recommendation or operating rating.
Chosen example at one common flow: 2 + 3 + 5 = 10 kPa across these series elements. The values are illustrative inputs, not measured parts or recommended limits. Actual losses depend on fluid, temperature, geometry and flow; parallel branches require their own network analysis.
Record which plugs, fittings, seals and hoses are installed during each specified check. Define the medium, conditions, limits and report separately for leak and pressure acceptance.
Agree the actual flow and thermal test configuration and responsible team. A component dimensional report or leak check does not establish complete-system performance.
Separate mounting datums, sealing interfaces and wetted passages. Confirm the specified final condition with the mating assembly.

Define your mounting datums, machining allowance and final inspection state.

Specify the finished thread, fitting engagement and agreed sealing surfaces.

Protect fins, finished contact faces and ports; agree cleaning and shipment condition.
A finish is not a universal cooling improvement. Confirm its purpose, compatibility and inspection state. Review surface finishing options →
Illustrative engineering concepts
Put the dimensions that control sealing, installed fit and connection access on your drawing.

Illustrative loop adapter section concept
Datum scheme, installed position and mechanical restraint
Thread designation, seal land and fitting engagement
Hole pattern, datum scheme and tool access
Passage geometry, tool access and cleaning scope
Flatness, masking, protected interfaces and inspection state
Resolve connections, routing, tests, wetted compatibility, cleanliness and approval ownership before release.
Specify mating threads, sealing geometry, selected fittings, seal materials, assembly instructions and any defined tightening requirements. Record the actual supplied connection state rather than inferring compatibility from a matching thread name.
Controlled drawing and the relevant service conditions.
Agreed method, inspection state, limits and required records.

Illustrative engineering concept
Review hose length, bend direction, selected minimum bend requirements, clamps, support and service movement. Keep the loop clear of sharp edges and nearby components; fitting access and removal should remain usable in the installed envelope.
Controlled drawing and the relevant service conditions.
Agreed method, inspection state, limits and required records.

Illustrative engineering concept
Agree cooling loop assembly leak testing separately from cooling loop assembly pressure testing. State the installed fittings, plugs, medium, temperature, limits, duration and records. Match the tested configuration to the delivered assembly boundary.
Controlled drawing and the relevant service conditions.
Agreed method, inspection state, limits and required records.

Illustrative engineering concept
Check coolant compatibility across the complete supplied wetted path: metal components, coatings, seals, selected hose and purchased connectors. Assign the owner for confirming compatibility and any separate system qualification.
Controlled drawing and the relevant service conditions.
Agreed method, inspection state, limits and required records.

Illustrative engineering concept
Define cooling loop assembly cleanliness by agreed particles or residues, method, cleaning, drying, caps and packaging. Specify cooling loop assembly traceability for part revisions, material identity, purchased items and required assembly or test records.
Controlled drawing and the relevant service conditions.
Agreed method, inspection state, limits and required records.

Illustrative engineering concept
Define cooling loop assembly sample approval around the supplied BOM, routing, installed fit, cleanliness and specified checks. A cooling loop flow test report needs its stated fluid, temperature, flow, pressure measurement locations and test boundary; thermal approval requires its own conditions and owner.
Controlled drawing and the relevant service conditions.
Agreed method, inspection state, limits and required records.

Illustrative engineering concept
Confirm revision, interfaces and operating inputs.
Agree materials, joining and final machining.
Review the finished component and assembly fit.
Assess specified dimensions, joints and test records.
Release the accepted revision, packaging and repeat-order scope.

Illustrative component concept
Connect each supplied part, hose, fitting and seal to the released bill of materials, routing layout and agreed final condition. Your liquid cooling loop assembly quote should separate manufacturing, purchased components, assembly, cleaning and specified tests. Keep the accepted component loop distinct from pump selection, controls, hydraulic validation and complete-system thermal approval.
These are review contexts for defined component loops, not complete qualified systems, customer installations or confirmed performance envelopes.

Review contact hardware, hose restraint and service removal.
Match selected fittings and manifold interface positions.
Confirm the released BOM and routing before repeat supply.
Define installed hoses, seals and acceptance state.
Identify the supplied branch connections and test boundary.
Match exact revisions, installed lengths and packaging.
Separate assembly records from complete-system approval.
State fluid, flow, temperature and measurement locations.
Ask your quote to separate component manufacturing, joining, finishing, inspection and any independently agreed validation. The drawing review confirms availability, quantities and delivery scope.
List every supplied part, hose, fitting, seal, plug and bracket with its specification, part number, revision and quantity. Include routing drawings, installed lengths, final condition, required records and anything supplied by another party.
Define the prototype boundary in the quotation. A component loop may contain the agreed cold plates, manifold, hoses, fittings and brackets while excluding pumps and controls. Availability and assembly scope require drawing review; the complete system has separate integration and validation responsibilities.
Specify the actual assembly, fittings, seals and plugs, the test method and medium, conditions, leakage limit, duration and supplied record. State whether the check covers a bare component, defined subassembly or final delivered loop.
Name the system or validation owner and agree the test configuration, fluid, inlet temperature, flow, pressure measurement locations, heat inputs and temperature limits. Manufacturing inspection or a leak check does not by itself establish hydraulic or thermal performance.
Use the selected hose and fitting specifications, installed lengths, approved bend requirements, restraints, keep-outs and service motion. Review fitting operation, removal access and nearby edges with the actual assembly.
Agree the BOM and drawing revisions, material and purchased-component identity, assembly state, cleanliness, dimensional or installation checks and specified test reports. Define who accepts the supplied loop and who validates the complete system.