Injection Molding
Tooling and molding for your repeat plastic parts.
From prototype to production, coordinated manufacturing solutions for your custom parts.
View All Services →
Precision parts for your tight tolerances and complex geometry.
Tooling and molding for your repeat plastic parts.

Metal casting options for your part and production volume.

Cutting, forming and welding for your fabricated parts.

Custom profiles for your section, length and finish requirements.

Finishes for your appearance, corrosion and wear requirements.

Sub-assemblies and final builds for your production program.

Production tooling built around your process and volume.

Prototype parts to check fit, function and design.
DFM, process planning and production support for your project.
Inspection, documentation, inventory and delivery planning for your program.
Choose air- or liquid-cooling components around your thermal and mechanical requirements.

Manufacturing support for your cold plates, manifolds and cooling assemblies.

Find components for your power electronics, energy, laser and telecom application.

Components for your electronic systems.
Start with your functional and quality requirements.
Build around your operating environment.
From prototype to production, review material performance, manufacturability and cost for your part.
Review grade, temper and finish for your metal parts.
AluminumStrength, weight and machining›
Stainless SteelCorrosion and finish requirements›
Carbon & Alloy SteelDiscuss grade and heat treatment›
Tool SteelDiscuss tooling and wear needs›
TitaniumReview grade and part geometry›
Copper & Brass & BronzeDiscuss conductivity and machining›Match your polymer to function, process and environment.
ABSReview enclosure and molding needs›
Polycarbonate (PC)Discuss clarity and impact needs›
Nylon (PA)Review moisture and wear conditions›
POM / AcetalReview fit and sliding features›
PEEKDiscuss operating conditions›
PTFEReview friction and chemical exposure›
ULTEM / PEIDiscuss thermal and electrical needs›Confirm grade availability and application requirements.
TPU / TPEReview flexibility and processing›
EPDMReview weathering and chemical exposure.›
NBRReview oil and fuel exposure.›
FKMReview temperature and chemical exposure.›
G10 / FR4Review insulation and laminate needs›
CompositesReview stiffness, weight and laminate.›Customer-Specified MaterialsConfirm your grade and requirements.›Other Specialty MaterialsDiscuss your application and grade.›Practical guidance for your part geometry and material decisions.
Prepare your process, budget and sourcing questions.
Build your knowledge before production.
Learn who we are and how we operate.
Find our U.S. support team or start a conversation.
YOUR INTERFACES · YOUR CONDITIONS · YOUR ACCEPTANCE
Define the cold plates, manifolds, interface blocks and brackets included in your order. Review the controlled drawings, coolant connections, material compatibility, cleanliness and sample evidence before manufacturing release.

Illustrative component concept
Critical geometry & interfaces
Grades, condition & compatibility
Defined route & final state
Agreed methods & records
Define the supplied parts, controlled interfaces, cleanliness and sample records.

List each delivered part and any fittings, seals or brackets included. Assign the interface owner where your components meet the server tray, rack manifold or CDU.

Share drawings, revisions, mounting datums, ports, mating connection specifications, fitting access and the installation envelope. Mark unresolved interfaces before production.

Review data center cooling component material selection against all wetted materials, coolant chemistry, seals, coatings and cleaning residues. Define data center cooling parts cleanliness by the agreed method and final packing state.

Agree data center cooling parts sample approval for material identity, finished dimensions, assembly fit and specified tests. Identify who approves each component and the installed system.
Illustrative engineering concepts
Select the parts actually included in your order. These concepts do not establish a complete CDU, qualified rack or facility cooling system.

Review the supplied heat-source interface, joining and final port state.
Review this supplied scope →
Define the branch and port schedule, cleaning and mounting interfaces.
Review this supplied scope →
Review mating fittings, seal lands, wrench access and final inspection.
Review this supplied scope →
Agree components, datums, hardware, connection boundary and supplied records.
Review this supplied scope →Illustrative engineering concepts
Data center cooling component machining should follow the controlled part drawing and the finished assembly interfaces. Define whether your supplied scope includes the cold plate, manifold, connection block, bracket, fittings or an agreed subassembly. A data center liquid cooling manifold prototype needs its released port schedule, installation envelope, cleaning requirements and sample acceptance; a component order does not by itself include facility cooling design or commissioning.
Choose material with your coolant, connected metals, seals, mass and manufacturing route in view. These stock references do not establish corrosion compatibility, a pressure rating or manifold flow performance.
A header distributes coolant; higher bulk conductivity alone does not make its branches more balanced.
Estimate mass using your finished volume. Confirm exact grade, product specification and required condition with the purchasing documents.
| Grade / European reference | Si | Fe | Cu | Mn | Mg | Zn | Al |
|---|---|---|---|---|---|---|---|
| 6061 · EN AW-6061 · AlMg1SiCu | 0.40–0.80 | ≤0.70 | 0.15–0.40 | ≤0.15 | 0.80–1.20 | ≤0.25 | Balance |
6061 additional selected limits: Cr 0.04–0.35%, Ti ≤0.15%; other elements ≤0.05% each / ≤0.15% total. Hydro reference, not a finished manifold certificate.
| Reference grade | European identifier | UNS | C | Cr | Ni | Mo |
|---|---|---|---|---|---|---|
| 304 | EN 1.4301 | S30400 | 0.04 | 18.1 | 8.1 | — |
| 316L | EN 1.4404 | S31603 | 0.02 | 17.2 | 10.1 | 2.1 |
Outokumpu Core/Supra Table 1 typical composition and Table 7 physical references. Dash means not listed in the selected summary, not zero. European identifiers aid drawing review; substitutions and final purchasing limits require approval.
Sources: Hydro 6061 → · Outokumpu Core 304 → · Outokumpu Supra 316L →
Compare the material reference, supplied records and system responsibilities. The mass chart is chosen arithmetic, not finished component weights or a thermal-performance report.
Chosen 10 cm³ volume × referenced density gives 27 g, 79 g and 80 g. Actual component mass follows your geometry; conductivity, compatibility, strength and manufacturing route require separate review. Source conditions and composition appear in the material section.
Specify methods, inspection state, criteria and supplied reports before sample release. Keep leak testing, pressure testing and thermal or hydraulic validation as distinct agreed scopes.
A component report covers its stated boundary. Installed-system flushing, controls, sensors, leak detection and commissioning require their own specifications and acceptance owner.
Separate your thermal contact faces, sealing interfaces and wetted passages. Confirm the specified final condition with the mating assembly.

Define the mating footprint, mounting datums, machining allowance and final inspection state.

Specify the finished thread, fitting engagement and agreed sealing surfaces.

Protect fins, finished contact faces and ports; agree cleaning and shipment condition.
A finish is not a universal cooling improvement. Confirm its purpose, compatibility and inspection state. Review surface finishing options →
Illustrative engineering concepts
Put the dimensions that control sealing, assembly fit and heat transfer on your drawing.

Illustrative component interface concept
Mating drawing, mounting datums and installation envelope
Thread designation, seal land and fitting engagement
Hole pattern, datum scheme and tool access
Joining access, wall thickness and cleaning scope
Flatness, masking, protected interfaces and inspection state
Resolve connection interfaces, material compatibility, test boundaries, cleanliness, records and system responsibilities before production.
Confirm the supplied component list, mating connection specifications, port designations, mounting datums and access for assembly or service. A matching thread name alone does not approve the installed connection.
Controlled drawing and the relevant service conditions.
Agreed method, inspection state, limits and required records.

Illustrative engineering concept
Review data center cooling component material selection for the entire wetted path, including stock metal, coatings, seals, fittings and residues. Confirm compatibility with the specified coolant and operating conditions; no universal corrosion guarantee is assumed.
Controlled drawing and the relevant service conditions.
Agreed method, inspection state, limits and required records.

Illustrative engineering concept
Specify data center cooling component leak testing separately from data center cooling manifold pressure testing. Define medium, temperature, test pressure or differential, duration, leakage criterion, supplied assembly state and reporting; no generic pressure rating is implied.
Controlled drawing and the relevant service conditions.
Agreed method, inspection state, limits and required records.

Illustrative engineering concept
Define data center cooling parts cleanliness by particle or residue requirements, sampling, test method, cleaning, drying, port caps and packaging where specified. Agree what can be verified after passage closure.
Controlled drawing and the relevant service conditions.
Agreed method, inspection state, limits and required records.

Illustrative engineering concept
Define data center cooling component traceability for material identity, controlled drawing revision, batch or component identification and the records supplied with your order. Confirm the agreed report set before manufacturing.
Controlled drawing and the relevant service conditions.
Agreed method, inspection state, limits and required records.

Illustrative engineering concept
Separate component dimensional and connection checks from rack installation, flushing, controls, leak detection and data center commissioning. Identify the system owner and the separately agreed validation scope.
Controlled drawing and the relevant service conditions.
Agreed method, inspection state, limits and required records.

Illustrative engineering concept
Confirm revision, interfaces and operating inputs.
Agree materials, joining and final machining.
Review the finished component and assembly fit.
Assess specified dimensions, joints and test records.
Release the accepted revision, packaging and repeat-order scope.

Illustrative component concept
For low volume data center cooling components, state sample quantities, revisions and repeat demand so the inspection and assembly plan matches your order. Your data center cold plate manufacturing quote should define heat-source interfaces, coolant conditions, material, final geometry and required checks. Data center cooling parts sample approval releases the agreed component state; it does not replace installed-system commissioning.
These are component review contexts, not completed facility projects, customer cases or complete-system certifications.

Match the delivered cold plates and connection boundary.
Define manifold ports, brackets and service access.
Specify only the supplied mechanical component scope.
Check controlled geometry before release.
Review mating revisions and packaging protection.
Agree fittings, seals, routing and specified tests.
Define quantities, changed drawings and sample records.
Separate component reports from installed-system commissioning.
Ask your quote to separate component manufacturing, joining, finishing, inspection and any independently agreed validation. The drawing review confirms availability, quantities and delivery scope.
For your custom data center cooling parts quote, provide the delivered component list, controlled drawings and revision, mating ports and mounting interfaces, material and finish, sample quantities and acceptance records. State whether fittings, brackets and assembly are included.
Specify the relevant particles or residues, inspection or sampling method, cleaning and drying conditions, accessible inspection state, port protection and packaging. Set acceptance with the system and coolant requirements; the word clean alone is not a measurable criterion.
No. A component leak report covers its defined assembly state, method and conditions. Installed-system flushing, pressure boundaries, controls, leak detection, connection verification and commissioning belong to the separately agreed integration scope and owner.
Review the port schedule, mating connections, mounting envelope, material identity, cleaning requirements and agreed dimensional or test evidence. Identify unresolved interfaces and approve the revised drawing before repeat supply.
Review the full wetted-material combination, coatings, seals, coolant chemistry and operating conditions against the system specification. A conductivity table or one alloy name does not establish whole-loop compatibility.
Agree the individual parts, machining, joining or assembly included, finishing, inspection, packaging and supplied records. Identify any separate thermal, hydraulic or installed-system validation. Delivery scope and availability depend on the actual drawing and order.