Injection Molding
Tooling and molding for your repeat plastic parts.
From prototype to production, coordinated manufacturing solutions for your custom parts.
View All Services →
Precision parts for your tight tolerances and complex geometry.
Tooling and molding for your repeat plastic parts.

Metal casting options for your part and production volume.

Cutting, forming and welding for your fabricated parts.

Custom profiles for your section, length and finish requirements.

Finishes for your appearance, corrosion and wear requirements.

Sub-assemblies and final builds for your production program.

Production tooling built around your process and volume.

Prototype parts to check fit, function and design.
DFM, process planning and production support for your project.
Inspection, documentation, inventory and delivery planning for your program.
Choose air- or liquid-cooling components around your thermal and mechanical requirements.

Manufacturing support for your cold plates, manifolds and cooling assemblies.

Find components for your power electronics, energy, laser and telecom application.

Components for your electronic systems.
Start with your functional and quality requirements.
Build around your operating environment.
From prototype to production, review material performance, manufacturability and cost for your part.
Review grade, temper and finish for your metal parts.
AluminumStrength, weight and machining›
Stainless SteelCorrosion and finish requirements›
Carbon & Alloy SteelDiscuss grade and heat treatment›
Tool SteelDiscuss tooling and wear needs›
TitaniumReview grade and part geometry›
Copper & Brass & BronzeDiscuss conductivity and machining›Match your polymer to function, process and environment.
ABSReview enclosure and molding needs›
Polycarbonate (PC)Discuss clarity and impact needs›
Nylon (PA)Review moisture and wear conditions›
POM / AcetalReview fit and sliding features›
PEEKDiscuss operating conditions›
PTFEReview friction and chemical exposure›
ULTEM / PEIDiscuss thermal and electrical needs›Confirm grade availability and application requirements.
TPU / TPEReview flexibility and processing›
EPDMReview weathering and chemical exposure.›
NBRReview oil and fuel exposure.›
FKMReview temperature and chemical exposure.›
G10 / FR4Review insulation and laminate needs›
CompositesReview stiffness, weight and laminate.›Customer-Specified MaterialsConfirm your grade and requirements.›Other Specialty MaterialsDiscuss your application and grade.›Practical guidance for your part geometry and material decisions.
Prepare your process, budget and sourcing questions.
Build your knowledge before production.
Learn who we are and how we operate.
Find our U.S. support team or start a conversation.
ZA-8 zinc aluminum alloy is a casting alloy. Your ZA8 alloy, ZA-8 properties and ZA-8 composition review should identify the product standard, route and actual final state.
| Element | Casting · ASTM B86 | Ingot · ASTM B240 |
|---|---|---|
| Al | 8.0–8.8 | 8.2–8.8 |
| Cu | 0.8–1.3 | 0.9–1.3 |
| Mg | 0.01–0.03 | 0.02–0.03 |
| Fe | ≤0.075 | ≤0.035 |
| Pb | ≤0.006 | ≤0.005 |
| Cd | ≤0.006 | ≤0.005 |
| Sn | ≤0.003 | ≤0.002 |
| Zn | Balance | Balance |
Selected Eastern Alloys reference. Verify the full ordered specification and revision. Ingot limits are not casting rejection limits; this is not your material-lot analysis.
| Your reference | What to confirm |
|---|---|
| ZP8 / ZP0810 | Casting-grade reference for your European drawing. |
| ZnAl8Cu1 | Alloy symbol; retain the complete specification. |
| ZL8 / ZL0810 | Ingot/liquid reference; distinguish from the final casting. |
| ZA-8 hot chamber die casting | Review the agreed casting route and usable machining stock. |
| ZA-8 creep resistance | Assess sustained load, temperature and duration together. |
ZA-8 density is typically 6.3 g/cm³ in the selected die-cast supplier reference. It does not establish casting soundness, final mass or load acceptance.
Common scale 0–30
Common scale 0–7
Selected NADCA casting chemistry and Eastern Alloys typical die-cast density references. These values do not rank cycle time, part cost or application performance. Casting route and complete product requirements still govern.
Eastern Alloys ZA-8 ↗ Eastern Alloys ZA-12 ↗ Eastern Alloys ZA-27 ↗ NADCA casting references ↗ IZA European names ↗
Your ZA-8 casting manufacturer review should identify the as-cast envelope, machined datums and the state inspected after finishing.
For your gearcase housing, connect the cavity, screw bosses, side port and mounting flange to machining access and final mating faces. Review ZA-8 die cast housings against the controlled assembly.
| Your fit | What to define |
|---|---|
| Working interface | Mounting flange, side port, bosses and sealing land. |
| Your route | Casting product, usable stock and supported machining. |
| Your approval | Final measurement state, surface and receiving evidence. |

Your ZA-8 machining review should define usable allowance, supported cutting and the surfaces inspected after the final operation.
| Your fit | What to define |
|---|---|
| Working interface | Mounting flange, side port, bosses and sealing land. |
| Your route | Casting product, usable stock and supported machining. |
| Your approval | Final measurement state, surface and receiving evidence. |

Specify the casting route, supplied state, usable stock and final coating requirements. Agree final inspection after the last dimension-changing operation.
| Your fit | What to define |
|---|---|
| Working interface | Mounting flange, side port, bosses and sealing land. |
| Your route | Casting product, usable stock and supported machining. |
| Your approval | Final measurement state, surface and receiving evidence. |

For your ZA-8 machined parts, identify the material records, final dimensions, accepted edges, cleanliness and individual protection.
| Your fit | What to define |
|---|---|
| Working interface | Mounting flange, side port, bosses and sealing land. |
| Your route | Casting product, usable stock and supported machining. |
| Your approval | Final measurement state, surface and receiving evidence. |

For your clevis link, define aligned pivot bores, ear relationship, mounting foot and the actual load, temperature and duration. Review custom ZA-8 clevis links against the controlled assembly.
| Your fit | What to define |
|---|---|
| Working interface | Pivot bores, ear relationship and foot datum. |
| Your route | Casting product, usable stock and supported machining. |
| Your approval | Final measurement state, surface and receiving evidence. |

Your ZA-8 machining review should define usable allowance, supported cutting and the surfaces inspected after the final operation.
| Your fit | What to define |
|---|---|
| Working interface | Pivot bores, ear relationship and foot datum. |
| Your route | Casting product, usable stock and supported machining. |
| Your approval | Final measurement state, surface and receiving evidence. |

Specify the casting route, supplied state, usable stock and final coating requirements. Agree final inspection after the last dimension-changing operation.
| Your fit | What to define |
|---|---|
| Working interface | Pivot bores, ear relationship and foot datum. |
| Your route | Casting product, usable stock and supported machining. |
| Your approval | Final measurement state, surface and receiving evidence. |

For your ZA-8 machined parts, identify the material records, final dimensions, accepted edges, cleanliness and individual protection.
| Your fit | What to define |
|---|---|
| Working interface | Pivot bores, ear relationship and foot datum. |
| Your route | Casting product, usable stock and supported machining. |
| Your approval | Final measurement state, surface and receiving evidence. |

For your bearing mount, define bore, mounting feet, lubrication and free or installed acceptance. A material name does not establish bearing duty. Review ZA-8 bearing components against the controlled assembly.
| Your fit | What to define |
|---|---|
| Working interface | Bearing bore, housing relationship and mounting feet. |
| Your route | Casting product, usable stock and supported machining. |
| Your approval | Final measurement state, surface and receiving evidence. |

Your ZA-8 machining review should define usable allowance, supported cutting and the surfaces inspected after the final operation.
| Your fit | What to define |
|---|---|
| Working interface | Bearing bore, housing relationship and mounting feet. |
| Your route | Casting product, usable stock and supported machining. |
| Your approval | Final measurement state, surface and receiving evidence. |

Specify the casting route, supplied state, usable stock and final coating requirements. Agree final inspection after the last dimension-changing operation.
| Your fit | What to define |
|---|---|
| Working interface | Bearing bore, housing relationship and mounting feet. |
| Your route | Casting product, usable stock and supported machining. |
| Your approval | Final measurement state, surface and receiving evidence. |

For your ZA-8 machined parts, identify the material records, final dimensions, accepted edges, cleanliness and individual protection.
| Your fit | What to define |
|---|---|
| Working interface | Bearing bore, housing relationship and mounting feet. |
| Your route | Casting product, usable stock and supported machining. |
| Your approval | Final measurement state, surface and receiving evidence. |

For your cover, connect the connector boss, screw pattern, visible fins and underside mating land to final finish and fit. Review custom ZA-8 connector covers against the controlled assembly.
| Your fit | What to define |
|---|---|
| Working interface | Connector boss, screw pattern and underside mating land. |
| Your route | Casting product, usable stock and supported machining. |
| Your approval | Final measurement state, surface and receiving evidence. |

Your ZA-8 machining review should define usable allowance, supported cutting and the surfaces inspected after the final operation.
| Your fit | What to define |
|---|---|
| Working interface | Connector boss, screw pattern and underside mating land. |
| Your route | Casting product, usable stock and supported machining. |
| Your approval | Final measurement state, surface and receiving evidence. |

Specify the casting route, supplied state, usable stock and final coating requirements. Agree final inspection after the last dimension-changing operation.
| Your fit | What to define |
|---|---|
| Working interface | Connector boss, screw pattern and underside mating land. |
| Your route | Casting product, usable stock and supported machining. |
| Your approval | Final measurement state, surface and receiving evidence. |

For your ZA-8 machined parts, identify the material records, final dimensions, accepted edges, cleanliness and individual protection.
| Your fit | What to define |
|---|---|
| Working interface | Connector boss, screw pattern and underside mating land. |
| Your route | Casting product, usable stock and supported machining. |
| Your approval | Final measurement state, surface and receiving evidence. |

Your ZA-8 machining allowance review should connect usable stock, support and the final coating state.

Define supported access, bore relationship and final bearing or housing fit.
Review the Process →
Connect clevis-ear and mounting-foot datums to one supported machining route.
Review the Process →
Define connector-cover hole positions, backing and accepted exits.
Review the Process →
Review final port geometry and sealing face after machining and finishing.
Review the Process →Define the assembly inputs before repeating quantities.
For your ZP0810 die casting review, define the cast envelope, locating areas and ZA-8 machining allowance. Review ZA-8 gravity casting separately from a hot-chamber quotation.
Define shaft, housing and working surface.
Agree stock, support and lubrication access.
Inspect the defined final state.

Specify final bore, mating part, interference or clearance and free or installed acceptance. Agree the measurement state.
Define shaft, housing and working surface.
Agree stock, support and lubrication access.
Inspect the defined final state.

Review sustained load, operating temperature, time and movement together. Room-temperature material strength does not establish long-term creep performance.
Define shaft, housing and working surface.
Agree stock, support and lubrication access.
Inspect the defined final state.

Define thread form, engagement, blind-hole depth, usable stock and accepted burrs around bosses and ports.
Define shaft, housing and working surface.
Agree stock, support and lubrication access.
Inspect the defined final state.

For ZA-8 plating, agree substrate preparation, coating system, appearance sample, masks and final dimensions.
Define shaft, housing and working surface.
Agree stock, support and lubrication access.
Inspect the defined final state.

Your ZA8 die casting services review should connect material identity to final features, agreed sampling and any separately specified functional test.
Define shaft, housing and working surface.
Agree stock, support and lubrication access.
Inspect the defined final state.





Agree accepted marks, coating build, masks and receiving protection. Confirm final dimensions after the last operation that changes fit.
Surface Finishing →| Your decision | What to confirm |
|---|---|
| Grade and product | Review complete chemistry, casting route and ordered requirements. |
| Sustained load | Compare applicable creep data for your temperature and duration. |
| Finish and fit | Approve the coating system, sample, masks and dimensions after finishing. |
| Material change | Obtain drawing-authority approval before substitution. |
A selected alloy reference does not establish the load capacity of your housing, link or bearing assembly.
Compare Zinc Alloys →Product identity and ordered requirements.
Complete route and locating relationship.
Final working surfaces and evidence.
Identify the ZA-8 grade, ordered standard, revision, casting route, stock, lot identity and required records.

Check mounting, bore and locating relationship after the complete route. Agree any separate functional test.

Verify the final port, pivot bore, foot or mounting pattern in the measurement state specified on your drawing.

Agree protection, cleanliness, lot identity and receiving documents for the actual mating surfaces.


Connect China manufacturing with Dallas-area coordination for drawing review, sample decisions and delivery requirements.
Your ZA-8 casting quote should use the same drawing revision, casting route, critical features and final coating state.
ZP8 / ZP0810 and ZnAl8Cu1 are common casting references associated with ZA-8. Retain the full product standard and revision; ZL8 / ZL0810 describes ingot or liquid alloy rather than the finished casting.
Yes, ZA-8 can use hot-chamber die casting. Confirm the actual geometry, tooling, supply and accepted process with your quote; do not apply this route automatically to ZA-12 or ZA-27.
Yes. Your ZA-8 machining review should identify usable stock, locating support, bore and thread access, accepted burrs and final measurement state after the complete route.
Provide CAD and controlled drawing, grade and product standard, proposed casting route, quantities, service load and temperature, final finish, fit and receiving evidence.
Review load, speed, lubrication, mating material, temperature and free or installed clearance. Material identity alone does not approve bearing life or duty.
Review geometry, section transitions, the casting route and accepted porosity limits with the foundry. Identify critical machined or sealing surfaces and agree any required integrity test separately.
State feature limits, datums, cast versus machined surfaces and the final coating state. Your quote confirms the reviewed geometry and inspection scope; no universal tolerance is promised.
Specify substrate preparation, coating system, visible faces, sample acceptance, masks, thread access and final dimensions. Keep coating approval connected to your actual mating parts.