Injection Molding
Tooling and molding for your repeat plastic parts.
From prototype to production, coordinated manufacturing solutions for your custom parts.
View All Services →
Precision parts for your tight tolerances and complex geometry.
Tooling and molding for your repeat plastic parts.

Metal casting options for your part and production volume.

Cutting, forming and welding for your fabricated parts.

Custom profiles for your section, length and finish requirements.

Finishes for your appearance, corrosion and wear requirements.

Sub-assemblies and final builds for your production program.

Production tooling built around your process and volume.

Prototype parts to check fit, function and design.
Choose air- or liquid-cooling components around your thermal and mechanical requirements.

Manufacturing support for your cold plates, manifolds and cooling assemblies.

Find components for your power electronics, energy, laser and telecom application.

Components for your electronic systems.
Start with your functional and quality requirements.
Build around your operating environment.
From prototype to production, review material performance, manufacturability and cost for your part.
Review grade, temper and finish for your metal parts.
AluminumStrength, weight and machining›
Stainless SteelCorrosion and finish requirements›
Carbon & Alloy SteelDiscuss grade and heat treatment›
Tool SteelDiscuss tooling and wear needs›
TitaniumReview grade and part geometry›
Copper & BrassDiscuss conductivity and machining›Match your polymer to function, process and environment.
ABSReview enclosure and molding needs›
Polycarbonate (PC)Discuss clarity and impact needs›
Nylon (PA)Review moisture and wear conditions›
POM / AcetalReview fit and sliding features›
PEEKDiscuss operating conditions›
PTFEReview friction and chemical exposure›
ULTEM / PEIDiscuss thermal and electrical needs›Confirm grade availability and application requirements.
TPU / TPEReview flexibility and processing›
EPDMReview weathering and chemical exposure.›
NBRReview oil and fuel exposure.›
FKMReview temperature and chemical exposure.›
G10 / FR4Review insulation and laminate needs›
CompositesReview stiffness, weight and laminate.›Customer-Specified MaterialsConfirm your grade and requirements.›Other Specialty MaterialsDiscuss your application and grade.›Practical guidance for your part geometry and material decisions.
Prepare your process, budget and sourcing questions.
Build your knowledge before production.
Learn who we are and how we operate.
Find our U.S. support team or start a conversation.
YOUR BOM. YOUR FIT. YOUR ACCEPTANCE.
Bring your drawings, bill of materials and critical interfaces into one review. Define contract mechanical assembly around component supply, fastening, fit and the evidence your receiving team needs.
1 controlled build scope before production. Fixtures, joining methods, testing and delivery are confirmed for your project.

Parts and revisions
Datums and stack-up
Sequence and access
Agreed checks and records
Protection and receiving
Make the delivered condition explicit so a missing part or undefined check does not become a receiving problem.
Component, mechanical subassembly or final mechanical build.
Customer-supplied, sourced or manufactured BOM items.
Critical datums, gaps, preload and movement.
Methods, limits, sampling and approval authority.
Quantity, identification, packaging and destination.
Review your joint and product function before selecting the method. Process suitability and resources are confirmed in your quotation.
For mechanical fastening, identify thread size, grade, engagement, coating and locking method. Torque alone does not describe joint performance.
| Your input | Drawing, fastener specification and joint surfaces. |
|---|---|
| Your decision | Agree tightening sequence, tool access and acceptance. |
| Your record | Part number, controlled revision and agreed acceptance. |

Keep abrasive, chips and coating buildup out of threaded holes. Confirm usable thread depth and screw length so the fastener does not bottom before clamping.
| Your input | Blind-hole depth, screw length and protected surfaces. |
|---|---|
| Your decision | Define cleaning, inspection and any permitted rework. |
| Your record | Part number, controlled revision and agreed acceptance. |

Torque controlled assembly needs your approved settings, sequence and verification method. Lubrication and thread treatments must match the documented joint condition.
| Your input | Torque specification, condition and tool requirements. |
|---|---|
| Your decision | Agree setup verification, recording and reaction to a missed setting. |
| Your record | Part number, controlled revision and agreed acceptance. |

Assess seating, gaps and the specified joint checks. A witness mark shows a recorded operation only when the work instruction defines what it means.
| Your input | Assembly drawing, check points and sample plan. |
|---|---|
| Your decision | Record accepted results and disposition of nonconforming joints. |
| Your record | Part number, controlled revision and agreed acceptance. |

Press fit assembly depends on actual mating dimensions, materials, finish and insertion support. Review the interference and the feature being located.
| Your input | Shaft/bore limits, material and surface condition. |
|---|---|
| Your decision | Confirm an appropriate method and assembly fixture design. |
| Your record | Part number, controlled revision and agreed acceptance. |

Direct installation force through the intended supported feature. A thin wall or unsupported shoulder may deform before the fit seats.
| Your input | Part cross-section, support faces and insertion direction. |
|---|---|
| Your decision | Agree fixtures, alignment and protected cosmetic surfaces. |
| Your record | Part number, controlled revision and agreed acceptance. |

Set assembly conditions from the approved design and trial evidence. Required force/displacement monitoring must be quoted and confirmed for your project.
| Your input | Fit limits, lubrication rules and process acceptance. |
|---|---|
| Your decision | Define the checks and the response to an out-of-window result. |
| Your record | Part number, controlled revision and agreed acceptance. |

Measure the installed position and relevant movement or retention requirement. Seating by appearance alone does not establish the complete acceptance.
| Your input | Datum, installed depth and functional requirement. |
|---|---|
| Your decision | Agree measurements and any project-specific retention check. |
| Your record | Part number, controlled revision and agreed acceptance. |

Riveting assembly needs hole geometry, material stack, joint loading and access from the actual assembly. Specify the fastener rather than just a head appearance.
| Your input | Rivet type, hole size and material stack. |
|---|---|
| Your decision | Agree joining method, tool access and acceptance sample. |
| Your record | Part number, controlled revision and agreed acceptance. |

Review gaps and support around the joint before upsetting the rivet. A deformed head cannot correct an incorrectly seated material stack.
| Your input | Stack thickness, mating surfaces and critical gaps. |
|---|---|
| Your decision | Define support and component locating. |
| Your record | Part number, controlled revision and agreed acceptance. |

Agree formed-head criteria and checks against the fastener and product requirements. Thin or finished sheets need appropriate surface protection.
| Your input | Fastener specification and appearance zones. |
|---|---|
| Your decision | Confirm setup and inspection at the agreed sampling basis. |
| Your record | Part number, controlled revision and agreed acceptance. |

Use defined seating, formed geometry and functional checks where specified. Destructive joint tests require a separately agreed method and sample allowance.
| Your input | Acceptance drawing and required test method. |
|---|---|
| Your decision | Record checks and segregate suspect assemblies. |
| Your record | Part number, controlled revision and agreed acceptance. |

Adhesive bonding assembly starts with the substrates, loads, environment and approved adhesive. Suitability is reviewed before committing to the route.
| Your input | Material grades, finish and service conditions. |
|---|---|
| Your decision | Agree adhesive selection responsibility and qualification scope. |
| Your record | Part number, controlled revision and agreed acceptance. |

Coatings, release agents and contamination can change bond behavior. Define the preparation method and the surfaces that must remain protected.
| Your input | Surface treatment and adhesive supplier instructions. |
|---|---|
| Your decision | Confirm preparation compatibility and cleanliness requirements. |
| Your record | Part number, controlled revision and agreed acceptance. |

Document mix or dispense conditions, positioning, bond-line requirements and cure according to the approved adhesive process. Do not invent one cure time for every material.
| Your input | Approved process and supplier data. |
|---|---|
| Your decision | Agree fixtures, time/condition controls and traceability. |
| Your record | Part number, controlled revision and agreed acceptance. |

A neat visible seam is not proof of strength. Define visual checks and any mechanical test, qualification or destructive sample requirement separately.
| Your input | Acceptance method and required evidence. |
|---|---|
| Your decision | Confirm inspection, sample allowances and release authority. |
| Your record | Part number, controlled revision and agreed acceptance. |

For bearing assembly services and shaft assembly services, define fits, preload or clearance, retention and lubrication from your controlled design.
| Your input | Bearing part numbers, shaft/bore limits and arrangement. |
|---|---|
| Your decision | Confirm installation and acceptance scope before work. |
| Your record | Part number, controlled revision and agreed acceptance. |

Specify the supported ring and load path for installation. Prevent contamination and unintended force transmission through rolling elements.
| Your input | Bearing supplier guidance and installation geometry. |
|---|---|
| Your decision | Agree tooling, handling and protection. |
| Your record | Part number, controlled revision and agreed acceptance. |

Spacers, shoulders, retaining features and coatings affect assembled position. Review the complete stack before changing a single component dimension.
| Your input | Datums, spacer limits and retention details. |
|---|---|
| Your decision | Define end position, axial condition and relevant checks. |
| Your record | Part number, controlled revision and agreed acceptance. |

Define rotation, endplay or other functional checks under stated conditions. No-load rotation alone does not prove service-life or load qualification.
| Your input | Operating requirement and agreed check conditions. |
|---|---|
| Your decision | Record measured results and outstanding qualification duties. |
| Your record | Part number, controlled revision and agreed acceptance. |

Mechanical enclosure assembly covers specified housings, covers, mounts and hardware. Electrical installation and testing require a separately confirmed scope.
| Your input | Assembly drawing, BOM and interfaces. |
|---|---|
| Your decision | Agree included components and excluded electrical work. |
| Your record | Part number, controlled revision and agreed acceptance. |

Finish thickness and handling can affect cover fit and fastener engagement. Mark cosmetic faces, gasket seats and protected interfaces.
| Your input | Finish specification and critical contact surfaces. |
|---|---|
| Your decision | Review masking, sequence and protective fixtures. |
| Your record | Part number, controlled revision and agreed acceptance. |

Metal component assembly and plastic component assembly need suitable datums and loading. Do not use fasteners to pull an out-of-position part into acceptance.
| Your input | Mounting datums, hole patterns and allowable gaps. |
|---|---|
| Your decision | Agree fixture location and dimensional checks. |
| Your record | Part number, controlled revision and agreed acceptance. |

Confirm cover fit, mounting alignment, hardware and appearance. Sealing or ingress tests are included only when the method and resources are agreed.
| Your input | Acceptance drawing, sample and packaging condition. |
|---|---|
| Your decision | Separate mechanical fit checks from product certification. |
| Your record | Part number, controlled revision and agreed acceptance. |

Sub assembly services and subassembly manufacturing connect defined components into a module for later integration. Name the incoming and delivered condition.
| Your input | Controlled BOM, drawings and integration boundary. |
|---|---|
| Your decision | Confirm components, assembly operations and final handoff. |
| Your record | Part number, controlled revision and agreed acceptance. |

For contract mechanical assembly, distinguish customer-supplied parts, approved purchased items and manufactured components. Missing ownership can delay a complete build.
| Your input | Part numbers, revisions, quantities and supply responsibility. |
|---|---|
| Your decision | Agree substitutions, shortages and nonconforming material handling. |
| Your record | Part number, controlled revision and agreed acceptance. |

Prototype assembly services and low volume assembly services need explicit validation goals. Freeze the accepted revision and assembly work instructions before repeat releases.
| Your input | Pilot quantity, critical functions and revision status. |
|---|---|
| Your decision | Confirm fixtures, first-article checks and change approval. |
| Your record | Part number, controlled revision and agreed acceptance. |

Build to print assembly needs a defined interface and receiving condition. Record accepted deviations rather than allowing undocumented changes to become the next baseline.
| Your input | Interface limits, inspection record and packing plan. |
|---|---|
| Your decision | Agree identification, revision traceability and receiving checks. |
| Your record | Part number, controlled revision and agreed acceptance. |


Identify the mechanical module, delivered revision and interfaces to the next assembly.
Approve the complete mechanical assembly, not only the individual parts.

Assign BOM supply, approved substitutions, incoming checks and shortage handling.
Approve the complete mechanical assembly, not only the individual parts.

Document assembly work instructions, locating features, fastener access and protection.
Approve the complete mechanical assembly, not only the individual parts.

Check the actual component stack and method before approving repeat work.
Approve the complete mechanical assembly, not only the individual parts.

Record specified dimensions, fastening and function; list deviations for approval.
Approve the complete mechanical assembly, not only the individual parts.

Match packaging, identification and records to your receiving and integration needs.
Approve the complete mechanical assembly, not only the individual parts.
Use the requirements your assembly actually needs; do not add unsupported tolerance or performance promises.
Precision mechanical assembly depends on defined references and functional requirements. A general precision label cannot replace your actual limits.
| Your input | Datum scheme and mating geometry. |
|---|---|
| Your decision | Agree fixture location and measurement method. |

Assembly tolerance stack up includes every contributing dimension, coating and operating condition. Individually accepted parts may still produce an unacceptable gap.
| Your input | Limits, datum relationships and functional target. |
|---|---|
| Your decision | Review a suitable stack-up method and acceptance limits. |

Threaded fasteners need usable hole depth, correct screw length and clean engagement. Remove trapped media and chips before tightening.
| Your input | Thread size, usable depth and screw length. |
|---|---|
| Your decision | Define cleaning, engagement and seating checks. |

Press fitting or bearing installation must use the intended load path and support. Do not transfer installation loads through vulnerable features.
| Your input | Fit limits and component supplier instructions. |
|---|---|
| Your decision | Confirm suitable tooling and process checks. |

Clamping and tightening can change thin-wall geometry. Review support and tightening sequence with the final mounting condition.
| Your input | Wall geometry, mounting and critical surfaces. |
|---|---|
| Your decision | Agree support and assembled measurements. |

Coatings, contamination and handling affect fit and appearance. Specify protected threads, seats and visible faces before finishing and assembly.
| Your input | Finish, cleanliness and masking requirements. |
|---|---|
| Your decision | Agree process sequence and surface acceptance. |

Metal and plastic components can respond differently to load, temperature and chemicals. Assess the intended environment and interface design.
| Your input | Grades, finishes and working conditions. |
|---|---|
| Your decision | Confirm joint suitability and applicable validation. |

Bill of materials assembly requires aligned drawings, part numbers and instructions. Substituting a purchased item can affect fit and function.
| Your input | BOM revision and approved alternatives. |
|---|---|
| Your decision | Authorize changes before use and record affected lots. |

Material names do not define a complete fit, finish or joint specification.

For machined parts assembly, identify datums, fits, finish thickness and protected surfaces.

Specify grade, surface condition and fastener compatibility for your environment.

Control axial position, retention, running interfaces and installed condition.

Confirm grade, load, surface interaction and allowable deformation.

Review insert retention, bosses, joint loading and critical molded dimensions.

Use approved bearing, seal, retaining and fastener part numbers; authorize substitutions.
Separate recurring unit work from components, fixtures and acceptance costs.
Consigned parts, approved sourcing or an agreed combination.
Prototype, pilot and repeat quantities; setup and fixtures.
Inspection, functional checks, records and packaging.
PLANNING EXAMPLE — NOT A PRICE OR CUSTOMER CASE
This is nominal BOM demand. Agree samples, setup allowances, spare quantities and any process loss separately; the example is not a minimum order.

Verify part numbers, quantities, revisions and incoming condition.

Use your approved datums, support and protected surfaces.

Follow the agreed sequence, settings and checks.

Link the accepted module to its revision and receiving condition.
Assembly and testing services require a stated method, limits and resources. Confirm any specialized test before ordering.
| 01 · Identity | Part numbers, BOM and drawing revision. |
|---|---|
| 02 · Interfaces | Critical dimensions, installed position and fit. |
| 03 · Joints | Specified fasteners, seating and process checks. |
| 04 · Function | Agreed movement or other defined check conditions. |
| 05 · Appearance | Protected faces, cleanliness and visible damage. |
| 06 · Release | Results, deviations, lot identification and approval. |
A dimensional report does not establish every functional requirement. Define sampling, records and qualification responsibilities in your scope.

| 01 · Identity | Part numbers, BOM and drawing revision. |
|---|---|
| 02 · Interfaces | Critical dimensions, installed position and fit. |
| 03 · Joints | Specified fasteners, seating and process checks. |
| 04 · Function | Agreed movement or other defined check conditions. |
| 05 · Appearance | Protected faces, cleanliness and visible damage. |
| 06 · Release | Results, deviations, lot identification and approval. |
A dimensional report does not establish every functional requirement. Define sampling, records and qualification responsibilities in your scope.

| 01 · Identity | Part numbers, BOM and drawing revision. |
|---|---|
| 02 · Interfaces | Critical dimensions, installed position and fit. |
| 03 · Joints | Specified fasteners, seating and process checks. |
| 04 · Function | Agreed movement or other defined check conditions. |
| 05 · Appearance | Protected faces, cleanliness and visible damage. |
| 06 · Release | Results, deviations, lot identification and approval. |
A dimensional report does not establish every functional requirement. Define sampling, records and qualification responsibilities in your scope.

| 01 · Identity | Part numbers, BOM and drawing revision. |
|---|---|
| 02 · Interfaces | Critical dimensions, installed position and fit. |
| 03 · Joints | Specified fasteners, seating and process checks. |
| 04 · Function | Agreed movement or other defined check conditions. |
| 05 · Appearance | Protected faces, cleanliness and visible damage. |
| 06 · Release | Results, deviations, lot identification and approval. |
A dimensional report does not establish every functional requirement. Define sampling, records and qualification responsibilities in your scope.


Industrial equipment assembly for your mounting, housing and mechanical module interfaces.

Review the mechanical carriage, fasteners and interfaces to the next integration step.

Define adjustment, location and repeat setup checks for your fixture.

Keep covers, mounts, hardware and final-fit inspection connected.
Illustrative application concepts, not actual customer case studies. Product suitability and validation are project-specific.
Coordinate your component supply, first-build decisions and delivery requirements with the responsible project team.

Review drawings, questions and approved decisions.
Define sourced and customer-supplied components.
Agree inspection, deviations and release evidence.
Coordinate packaging, destination and shipment records.
Request an NDA before sharing confidential information. A complete BOM helps expose missing ownership and long-lead components before scheduling.
Mechanical assembly joins components into a defined working unit using specified fits, fasteners or other approved joining methods. For this page, the scope is industrial mechanical components and subassemblies, controlled by your BOM, drawings and acceptance requirements.
A subassembly is a group of connected components delivered as one module for later integration. A supported shaft and bearing bracket, for example, can be a mechanical subassembly within a larger machine. Define its interfaces and delivered condition.
Mechanical work concerns physical fit, joining and motion. Electromechanical work also includes electrical components, connections and applicable testing. Electrical integration, wiring and test capability require a separately confirmed scope.
Send the BOM and identify your supplied components. Agree incoming inspection, quantities, shortages, damaged or incorrect parts, permitted loss, storage ownership and return of unused items. Receiving a shipment does not by itself approve every component.
Turnkey mechanical assembly usually includes an agreed component procurement and build scope. It does not automatically transfer product design, certification or every functional test to the assembler. Confirm the purchased items, engineering responsibility and acceptance in writing.
Cost depends on components, setup, fixtures, joining steps, manual work, inspection, functional checks, documentation, packaging and quantity. Compare quotes on the same BOM and delivered scope; separate nonrecurring fixture costs from repeat unit work.
Identify functional datums and limits, review the complete tolerance chain, select appropriate fixtures and document the installation method. Confirm the first assembly against relevant dimensions and function. Individual part acceptance alone does not prove assembled fit.
Use agreed visual, dimensional, fastening and functional checks under specified conditions. Name the method, limits, sampling and required records. Leakage, load, endurance, electrical or other specialized tests require explicit resource and scope confirmation.
Mechanical assembly minimum order and mechanical assembly lead time depend on component availability, batch size, setup, fixtures, first-build approval, inspection and schedule. Send your trial and repeat quantities plus required delivery date for a project-specific review.
Provide the controlled assembly drawing, component CAD, BOM, supply responsibility, quantities, critical fits and joining requirements. Include inspection, packaging and destination. Custom mechanical assembly and outsourced mechanical assembly both need an explicit delivered condition.
Aligned revisions, component responsibility and approved substitutions.
Fit, joining, appearance and agreed check evidence.
Records, packaging, quantities and receiving requirements.
OEM assembly services and repeat releases follow the approved mechanical scope and revision.