Supplier quotes become comparable when each covers the same part, acceptance requirements, quantity, and delivery basis. Resolve exclusions before ranking prices.
Send one controlled RFQ package
The week after an industry event can produce quotations with different assumptions. Check what each supplier received. Use the same 2D drawing revision and corresponding 3D model, material grade, finishing specification, quantity breaks, and requested delivery destination.
Identify which document controls if model and drawing conflict. Flag critical characteristics and inspection requirements. If the package changes, issue a revision to every participating supplier and confirm the effect on price and timing. Otherwise, your comparison may reward the supplier quoting the oldest or least complete requirement.
Require visible assumptions and exclusions
Ask suppliers to identify assumptions, unpriced work, and remaining confirmations. “Finish included” is less useful than a stated finish specification with masking and appearance criteria. Link “inspection included” to an agreed scope.
Request a quote validity period and define when lead time begins. Is it measured from order placement, deposit, drawing approval, material availability, or sample approval? Different start points make identical lead-time numbers mean different things.
Normalize one-time and recurring charges
Separate unit price from tooling, programming, fixtures, samples, qualification documents, packaging, and other one-time charges. Record what repeats with a new revision or order. For tooling, ask about ownership, storage, maintenance, and transfer.
Show one-time charges separately and allocate them across the same planning volume in a second view. Label the allocation as an assumption. Do not hide the upfront commitment in an attractive amortized piece price.
| RFQ field | Comparison basis | Typical gap |
|---|---|---|
| Drawing and material | Same revision and grade | Undisclosed substitute |
| Quantity and releases | Same lot sizes and forecast status | Larger commitment assumed |
| Inspection and documents | Same acceptance scope | Special report omitted |
| One-time charges | Separate and disclosed | Fixture cost deferred |
| Delivery | Same destination and cost scope | Freight excluded |
| Lead time | Same start trigger | Clock starts after approval |
Compare the same delivery basis
Confirm the named delivery location, freight scope, relevant insurance assumptions, and charges outside the quotation. Have your logistics or customs specialist verify import treatment for the actual goods and route. A general article cannot establish landed cost for an unspecified shipment.
Keep freight and import estimates separate from confirmed supplier charges. Where a quotation uses a trade term, confirm its applicable version and named place in the purchase documents. A factory pickup offer and a delivered offer include different work.
Resolve gaps before negotiating
Mark each field as confirmed, excluded, or awaiting clarification. Send a consolidated clarification request to each supplier. Compare the complete commitment and delivery evidence after responses arrive.
Make negotiation specific: a quantity change, approved design alternative, release plan, or clarified packaging. A general demand to match the cheapest price can encourage removal of scope that your team still expects.
What management should see
Present the normalized price alongside the outstanding risks. Name who will resolve each exclusion and when. If an unpriced requirement could change the selection, obtain a revised quote before seeking final approval. Record the final quote revision with the purchase order so later changes remain traceable.
Frequently asked questions
Should I reject the most expensive quote?
First check scope and evidence. A higher quotation may include work or risk controls that others exclude.
Should I share competitors’ quotations?
Use a normalized requirements sheet for clarification. Handle confidential supplier quotations under your company’s procurement rules.
Prepare a comparable quotation
Share your drawing revision, material, quantities, finish, inspection scope and delivery requirements with LK MFG.